P
PlycemCA

Estimator Resources

Pricing Structure and Volume Discounts

Plycem High Performance Subfloor panels are priced competitively to provide 65-70% cost savings compared to USG Structo-Crete while maintaining premium quality and performance. All Plycem prices are CIF Long Beach (Cost, Insurance, and Freight).

Volume Pricing Tiers

Price Notes:

  • Plycem prices are CIF Long Beach (Cost, Insurance, and Freight — includes product, ocean freight, and insurance to Long Beach port)
  • Prices shown are for 20mm panels
  • 22mm, 25mm, and 30mm panels: +$3-5 per mm thickness increment
  • Tongue & groove (T&G) variants: Add $2/panel
  • Delivery and logistics support available - pricing depends on location and order size
  • Volume discounts and special terms available for multi-project contracts

1-49 panels

$88/panel

25 panels = $2,200

65-70% savings vs USG

50-149 panels

$85/panel

100 panels = $8,500

65-70% savings vs USG

150-299 panels

$82/panel

200 panels = $16,400

65-70% savings vs USG

300+ panels

$79/panel

300 panels = $23,700

65-70% savings vs USG

Full Competitive Comparison

Comprehensive evaluation of Plycem against USG Structo-Crete and poured gypsum concrete systems.

CharacteristicPlycemStructo-CretePoured Gypsum
Material TypeFiber-reinforced Portland cementFiber-reinforced cementitious structural panelGypsum-based slurry
CombustibilityNon-combustible (ASTM E136)Non-combustible (ASTM E136)Non-combustible
Fire Rating1-hr & 2-hr (UL designs)1-hr & 2-hr (UL designs)Up to 3-hr
Flame Spread (E-84)0 (Perfect)00
Smoke Dev. (E-84)0 (Perfect)00
Cost per 4'x8'$79-88 (CIF Long Beach)$255-270 (retail)$90-120 equiv.
Cost per SF$2.45-2.75$8.00-8.40$2.80-3.75
Lead Time (West Coast)0-3 days2-6 weeks7-14 days
Weight (20mm equiv.)149.6 lbs/panel~170 lbs/panel~300 lbs/area
Moisture ResistanceExcellent (cement matrix)Good (gypsum + perlite)Good (requires curing)
InstallationScrew fasteningScrew/staple fasteningPumped and leveled
Install Speed800-1000 SF/day700-900 SF/dayPour + 48-72hr cure
STC50-55 (system dependent)*50-58 (system dependent)*55-65 (system dependent)*
IIC50-55 w/ underlayment*50-55 w/ underlayment*60-70 w/ underlayment*

* Values based on specific UL/GA assemblies including framing, insulation, and ceiling finish. Board alone does not have independent STC/IIC ratings.

Cost-Benefit Analysis: 10,000 SF Floor

Typical multifamily floor installation comparison (material costs only). Based on current retail pricing data.

Plycem (CIF Long Beach)

$26,880

~320 panels x $84 avg

USG Structo-Crete (retail)

$83,840

~320 panels x $262 avg

Your Savings

$56,960

68% material cost reduction per floor

Additional value: Immediate availability eliminates carrying costs and schedule risk

Pricing Sources: Plycem pricing is CIF Long Beach (Cost, Insurance, and Freight — includes product, ocean freight, and insurance to Long Beach port). Structo-Crete retail pricing from New England Gypsum and Tamarack Materials listings (February 2026): $255-270/panel or $8.00-8.40/SF. Installation labor costs are comparable between products (~$2.50-3.50/SF).

Availability & Logistics

Warehouse

Long Beach, CA

20mm In Stock

1,500+ panels ready

Stock Delivery

0-3 business days

Container Orders

6-8 week lead time

Container Load Specifications

40' High Cube container capacities and logistics timeline.

ThicknessPanels per 40' HC
20mm~300 panels
22mm~270 panels
25mm~240 panels

Ocean Transit: 14-21 days from Costa Rica/El Salvador to US West Coast.

Customs Clearance: 2-5 business days.

Job Site Delivery: 1-3 days from Long Beach warehouse.

Project Planning Recommendations:

  • For projects requiring >1,000 panels: Place order 10-12 weeks before installation date
  • For projects requiring <500 panels: Current stock typically sufficient for 3-5 business day delivery
  • Large projects (1,000+ panels): Contact sales for dedicated production slot and delivery schedule coordination

Contact Robertson Carrillo Z. at +1 (415) 532-3376 or robert@plycemca.com for project-specific lead time confirmation and delivery coordination.